Ítem
Acceso Abierto
Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time
dc.creator | Cruz, Antonio M. | |
dc.creator | Barr, Cameron | |
dc.creator | Puñales-Pozo, Elsa | |
dc.creator.google | Cruz, Antonio M. | spa |
dc.creator.google | Barr, Cameron | spa |
dc.creator.google | Puñales-Pozo, Elsa | spa |
dc.date.accessioned | 2020-05-10T02:49:18Z | |
dc.date.available | 2020-05-10T02:49:18Z | |
dc.date.created | 2008 | |
dc.date.issued | 2008 | |
dc.description | Objetivos Construir un predictor que permita estimar los valores de tiempo de cambio de estado (del ingles TAT) y usar técnicas de conglomerados para encontrar las posibles causas de los valores no deseados de TAT. Materiales y Métodos Para llevar a cabo esta investigación se realizaron los siguientes pasos: Selección, reducción y caracterización de los datos contenidos en la base de datos bajo estudio y Construcción del Indicador bajo estudio. El indicador bajo estudio fue el tiempo de cambio de estado (por sus siglas en inglés TAT). Resultados Se construyó el nuevo predictor para TAT basado en técnicas de regresión múltiple. Las variables que más contribuyeron a la construcción del nuevo predictor fueron tiempo de respuesta del departamento de IC (CErt), con un coeficiente 0,415 positivo, tiempo de respuesta de entrega de las piezas de repuesto (Stockrt), con un coeficiente de 0,734 positivo, nivel de prioridad del equipamiento (RL), con un coeficiente de 0,25 positivo, y tiempo de servicio de mantenimiento (ST), con un coeficiente de 0.06 positivo. La tecnica de regresión aplicada demostró una fuerte dependencia de las variables Stockrt, CErt, y PL en este orden. Las técnicas de conglomerados encontró las principales causas por las cuales el valor de TAT era demasiado alto. Conclusiones. El estudio demostró que es posible aplicar técnicas de minerías de datos para mejorar la eficiencia de las actividades que se desarrollan en los departamentos de Ingeniería de los hospitales. | spa |
dc.description.abstract | Objectives This research's main goals were to build a predictor for a turnaround time (TAT) indicator for estimating its values and use a numerical clustering technique for finding possible causes of undesirable TAT values. Materials and methods The following stages were used: domain understanding, data characterisation and sample reduction and insight characterisation. Building the TAT indicator multiple linear regression predictor and clustering techniques were used for improving corrective maintenance task efficiency in a clinical engineering department (CED). The indicator being studied was turnaround time (TAT). Results Multiple linear regression was used for building a predictive TAT value model. The variables contributing to such model were clinical engineering department response time (CErt, 0.415 positive coefficient), stock service response time (Stockrt, 0.734 positive coefficient), priority level (0.21 positive coefficient) and service time (0.06 positive coefficient). The regression process showed heavy reliance on Stockrt, CErt and priority, in that order. Clustering techniques revealed the main causes of high TAT values. Conclusions This examination has provided a means for analysing current technical service quality and effectiveness. In doing so, it has demonstrated a process for identifying areas and methods of improvement and a model against which to analyse these methods' effectiveness. | spa |
dc.format.mimetype | application/pdf | |
dc.identifier.doi | https://doi.org/10.1590/S0124-00642008000500013 | |
dc.identifier.issn | 0124-0064 | |
dc.identifier.uri | https://repository.urosario.edu.co/handle/10336/21924 | |
dc.language.iso | eng | spa |
dc.relation.citationEndPage | 817 | |
dc.relation.citationIssue | No. 5 | |
dc.relation.citationStartPage | 808 | |
dc.relation.citationTitle | Revista de Salud Publica | |
dc.relation.citationVolume | Vol. 10 | |
dc.relation.ispartof | Revista de Salud Publica, ISSN: 0124-0064 Vol. 10, No. 5 (2008) pp. 808-817 | spa |
dc.relation.uri | http://www.scielo.org.co/pdf/rsap/v10n5/v10n5a13.pdf | spa |
dc.rights.accesRights | info:eu-repo/semantics/openAccess | |
dc.rights.acceso | Abierto (Texto Completo) | spa |
dc.source.instname | instname:Universidad del Rosario | |
dc.source.reponame | reponame:Repositorio Institucional EdocUR | |
dc.subject | Mantenimiento | spa |
dc.subject | Estadística y datos numéricos | spa |
dc.subject | Gerencia | spa |
dc.subject.ddc | Promoción de salud | spa |
dc.subject.ddc | Programación, programas, datos de computación | spa |
dc.subject.keyword | Humans | spa |
dc.subject.keyword | Maintenance | spa |
dc.subject.keyword | Regression analysis | spa |
dc.subject.keyword | Biomedical technology | spa |
dc.subject.keyword | Decision support system | spa |
dc.subject.keyword | Management | spa |
dc.title | Building a new predictor for multiple linear regression technique-based corrective maintenance turnaround time | spa |
dc.title.TranslatedTitle | Estimación de predictor para el tiempo de parada del mantenimiento correctivo usando regresión lineal múltiple; | spa |
dc.type | article | eng |
dc.type.hasVersion | info:eu-repo/semantics/publishedVersion | |
dc.type.spa | Artículo | spa |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- Building_a_New_Predictor_for_Multiple.pdf
- Tamaño:
- 83.03 KB
- Formato:
- Adobe Portable Document Format
- Descripción: